Homepage
Author:
Aztec Minerals Corp.
Posted Date:
May 14, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone Step Outs at Tombstone; intersecting 2.31 gpt Au and 43.23 gpt Ag over 27.4 m within 66.9 m of 1.05 gpt Au and 23.21 gpt Ag
Aztec Minerals Corp.
May 14, 2026
Aztec Minerals Engages APEX Geoscience Ltd. to Commence Maiden Mineral Resource Estimates on the Tombstone and Cervantes Projects
Aztec Minerals Corp.
April 30, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona; intersecting 0.62 gpt Au and 24.8 gpt Ag over 107.9m in Westside Area and 0.48 gpt Au and 12.6 gpt Ag over 112.5m at Contention Area
Aztec Minerals Corp.
April 16, 2026
Aztec Drilling Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona; intersecting 0.62 gpt Au and 24.8 gpt Ag over 107.9m in Westside Area and 0.48 gpt Au and 12.6 gpt Ag over 112.5m at Contention Area
Aztec Minerals Corp.
April 15, 2026
Aztec Minerals Increases Drilling Program by 4,500 Meters and Commences Downhole Geophysical Survey of Core Holes at Tombstone Project, Arizona
Aztec Minerals Corp.
March 10, 2026
Aztec Drills Oxide Gold & Silver in the Westside Area of the Tombstone Project, Arizona; Intersecting 44.1m of 0.86gpt AuEq (0.22 gpt Au and 44.6 gpt Ag) as Part of a 250m Step Out; And has Joined the Contention and Westside Areas
Aztec Minerals Corp.
March 2, 2026
Aztec Step-Out Drilling Extends Oxide Au/Ag Zone on Strike to +1km at Tombstone Project, Arizona; Drills 44.1m of 1.16 gpt Au and 77.7 gpt Ag (159.0 gpt AgEq) including 3.04 m of 7.5gpt Au & 465.5 gpt Ag (990.8 gpt AgEq)
Aztec Minerals Corp.
January 28, 2026